  "title": "谁为电网扩建付费？",
  "summary": "不是自由选择：cost allocation 写在法律与 order 中。美国社会化并 beneficiary pays；巴西按 TUST×MUST 收费；欧盟用 CBCA。",
  "author": "NiLu",
  "publishedAt": "2026-08-28T00:00:00.000Z",
  "updatedAt": "2026-08-28T00:00:00.000Z",
  "canonicalUrl": "https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang/",
  "representations": {
    "html": "https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang/",
    "markdown": "https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang.md",
    "json": "https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang.json"
  },
  "bodyMarkdown": "# 谁为电网扩建付费？\n\n不是自由选择：cost allocation 写在法律与 order 中。美国社会化并 beneficiary pays；巴西按 TUST×MUST 收费；欧盟用 CBCA。\n\nAuthor: NiLu\nLocale: zh\nPublished: 2026-08-28\nUpdated: 2026-08-28\nCanonical: https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang/\nMarkdown: https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang.md\nJSON: https://blog.nilu.pro/zh/blog/shei-fukuan-dianwang-kuozhang.json\n\n## 摘要\n\n- 谁为电网加强或使用付费，是写在法律、order 或招标文件中的方法、角色与期限组合。\n- 在美国，Order 1000 要求 beneficiary pays “roughly commensurate”；Order 1920 要求带有 ex ante 方法的 20 年规划。\n- 在巴西，拍卖以最低 RAP（30 年）付酬，使用随后按 EUST = TUST × MUST 收取。\n- 在欧盟，电价须 cost-reflective；跨境成本经 CBCA 分摊，ACER 为终审。\n\n## 目录\n\n- [不是运营商的自由选择](#bu-shi-ziyou-xuanze)\n- [三类机制](#san-lei-jizhi)\n- [各区块如何收费](#ge-qukuai-ruhe-shoufei)\n- [电价保护的语言](#dianjia-baohu)\n- [不确定性](#buquedingxing)\n\n<a id=\"bu-shi-ziyou-xuanze\"></a>\n\n## 不是运营商的自由选择\n\n谁为电网扩建付费，不是各特许经营者的自由决定。它是写在 order、法律、法令或招标文件中的 cost allocation 方法、机构角色与特许合同组合。因此，有用的问题不是“谁应该付费？”，而是“这一司法辖区记录了哪种方法——以及针对哪一类加强？”。 [[1]](#ref-1)\n\n<a id=\"san-lei-jizhi\"></a>\n\n## 三类机制\n\n第一类是经由使用电价的区域社会化。在美国，FERC Order No. 1000 要求事先（ex ante）确定的区域方法；Principle 1 要求把成本分摊给受益者，“in a manner that is at least roughly commensurate with estimated benefits”。 [[1]](#ref-1) Order 1920（2024 年五月 13 日）要求长期规划——最短视野 20 年——以及电价中的 ex ante 方法；允许州级协议，但不能是唯一方法。 [[7]](#ref-7)\n\n第二类是 participant funding：接入方支付研究归属于其项目的加强。Order 2023 按比例影响分摊集群成本——设计以发电为中心；large loads 另有讨论。 [[6]](#ref-6)\n\n第三类把两极与额外的消费者保护结合起来——词汇随司法辖区而变，问题相同。\n\n<a id=\"ge-qukuai-ruhe-shoufei\"></a>\n\n## 各区块如何收费\n\n在巴西，输电拍卖以最低允许年收入（RAP）向中标者付酬——在 Edital nº 4/2025 中为 30 年，每 5 年修订。使用随后收取：EUST = 已核准 TUST × MUST，与当月实际使用无关。 [[2]](#ref-2) [[3]](#ref-3) ANEEL 监管，ONS 运营 SIN，MME 决定配电特许延期。 [[11]](#ref-11) [[12]](#ref-12) [[13]](#ref-13)\n\n在欧盟，Regulamento (UE) 2019/943 第 18 条要求电价 cost-reflective、透明、非歧视。在国家之间，Regulamento (UE) 2022/869 的 CBCA 分摊共同利益项目的成本；若各国监管者在 6 个月内未达成协议，由 ACER 决定。 [[4]](#ref-4) [[5]](#ref-5)\n\n<a id=\"dianjia-baohu\"></a>\n\n## 电价保护的语言\n\n- 美国：电价 “just and reasonable”（Federal Power Act §205）与 beneficiary pays。 [[9]](#ref-9) [[1]](#ref-1)\n- 巴西：“modicidade tarifária” 作为延期条件。 [[16]](#ref-16) [[13]](#ref-13)\n- 欧盟：cost-reflective，以及 ACER 的 “disproportionate burden for consumers” 测试。 [[4]](#ref-4) [[17]](#ref-17)\n\n这些是规范文本自身的标准——不是哪一种设计更好的排名。\n\n<a id=\"buquedingxing\"></a>\n\n## 不确定性\n\n凭本档案来源，无法详述美国区域 OATT 在遵守 Order 1000 与 1920 之后的实际公式。美国 large loads 的分摊将如何在 Order 2023 的发电设计之外稳定下来，也不清楚。\n\n<a id=\"yue-du-dangan\"></a>\n\n## 阅读档案\n\n角色、特许期限与进行中的争议见[谁付费、谁决定电网扩张](/zh/blog/shei-fukuan-shei-jueding-dianwang/)。\n\n## 参考文献\n\n1. <a id=\"ref-1\"></a>[FERC Order No. 1000 — Transmission Planning and Cost Allocation](https://www.ferc.gov/sites/default/files/2020-04/OrderNo.1000.pdf). FERC. Acesso em 09 ago. 2026.\n2. <a id=\"ref-2\"></a>[Edital Leilão de Transmissão nº 4/2025-ANEEL](https://ppi.gov.br/wp-content/uploads/2025/02/SEI_0202054_Edital_de_Leilao_04_2025.pdf). ANEEL / PPI. Acesso em 09 ago. 2026.\n3. <a id=\"ref-3\"></a>[ONS — Submódulo 15.8 (Encargos de Uso do Sistema de Transmissão)](https://www.ons.org.br/ProcedimentosDeRede/M%C3%B3dulo%2015/Subm%C3%B3dulo%2015.8/Subm%C3%B3dulo%2015.8%202018.12.pdf). ONS. Acesso em 09 ago. 2026.\n4. <a id=\"ref-4\"></a>[Regulation (EU) 2019/943 — Art. 18 network charges](https://eur-lex.europa.eu/eli/reg/2019/943/oj/eng). EUR-Lex. Acesso em 09 ago. 2026.\n5. <a id=\"ref-5\"></a>[ACER — Cross-Border Cost Allocation (Reg. (EU) 2022/869 Art. 16)](https://www.acer.europa.eu/electricity/infrastructure/projects-common-interest/cross-border-cost-allocation). ACER. Acesso em 09 ago. 2026.\n6. <a id=\"ref-6\"></a>[FERC Order No. 2023 explainer — interconnection cost allocation](https://www.ferc.gov/explainer-interconnection-final-rule). FERC. Acesso em 09 ago. 2026.\n7. <a id=\"ref-7\"></a>[FERC Order No. 1920 explainer — transmission planning and cost allocation](https://www.ferc.gov/explainer-transmission-planning-and-cost-allocation-final-rule). FERC. Acesso em 09 ago. 2026.\n9. <a id=\"ref-9\"></a>[Federal Power Act §205 — just and reasonable rates (16 U.S.C. §824d)](https://www.law.cornell.edu/uscode/text/16/824d). Cornell LII. Acesso em 09 ago. 2026.\n11. <a id=\"ref-11\"></a>[Lei nº 9.427/1996 — cria a ANEEL](https://www.planalto.gov.br/ccivil_03/leis/l9427compilada.htm). Planalto. Acesso em 09 ago. 2026.\n12. <a id=\"ref-12\"></a>[Decreto nº 5.081/2004 — regula o ONS](http://www.planalto.gov.br/ccivil_03/_ato2004-2006/2004/decreto/d5081.htm). Planalto. Acesso em 09 ago. 2026.\n13. <a id=\"ref-13\"></a>[Decreto nº 12.068/2024 — prorrogação/licitação de concessões de distribuição](https://www.planalto.gov.br/ccivil_03/_ato2023-2026/2024/decreto/D12068.htm). Planalto. Acesso em 09 ago. 2026.\n16. <a id=\"ref-16\"></a>[Lei nº 12.783/2013 — prorrogação de concessões e modicidade tarifária](https://www.planalto.gov.br/ccivil_03/_ato2011-2014/2013/lei/l12783.htm). Planalto. Acesso em 09 ago. 2026.\n17. <a id=\"ref-17\"></a>[ACER Recommendation 02/2023 — CBCA good practices](https://acer.europa.eu/sites/default/files/documents/Recommendations/ACER_Recommendation_02-2023_CBCA.pdf). ACER. Acesso em 09 ago. 2026.\n"
}