<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>NiLu — Editorial blog built for humans and AI agents · Articles</title>
    <link>https://blog.nilu.pro/en/blog/</link>
    <description>Editorial dossiers organized by lot — data centers, electric grids, agent-ready web — with traceable evidence and machine-readable formats for AI agents.</description>
    <language>en</language>
    <atom:link href="https://blog.nilu.pro/en/rss.xml" rel="self" type="application/rss+xml"/>
    <item>
      <title>What is the difference between SEO and GEO?</title>
      <link>https://blog.nilu.pro/en/blog/difference-between-seo-and-geo/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/difference-between-seo-and-geo/</guid>
      <pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate>
      <description>SEO is being found in search. GEO is being cited in a generative answer. At Google, optimizing for AI is still SEO; a citation is not a click.</description>
    </item>
    <item>
      <title>How much energy does a data center use?</title>
      <link>https://blog.nilu.pro/en/blog/how-much-energy-does-a-data-center-use/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/how-much-energy-does-a-data-center-use/</guid>
      <pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate>
      <description>There is no single number: MW is not MWh, and use depends on load, location, and whether you measure power, energy, or capacity.</description>
    </item>
    <item>
      <title>What is a grid interconnection queue?</title>
      <link>https://blog.nilu.pro/en/blog/what-is-a-grid-interconnection-queue/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/what-is-a-grid-interconnection-queue/</guid>
      <pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate>
      <description>A generation queue is not a load queue. MW in queue is not an operation date. Reinforcement is a study outcome, not a universal MW threshold.</description>
    </item>
    <item>
      <title>Who pays for electric grid expansion?</title>
      <link>https://blog.nilu.pro/en/blog/who-pays-for-grid-expansion/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/who-pays-for-grid-expansion/</guid>
      <pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate>
      <description>Not a free choice: cost allocation is written in law and order. The US uses beneficiary pays; Brazil bills TUST×MUST; the EU uses CBCA.</description>
    </item>
    <item>
      <title>Why does the electric grid limit data center growth?</title>
      <link>https://blog.nilu.pro/en/blog/why-the-grid-limits-data-center-growth/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/why-the-grid-limits-data-center-growth/</guid>
      <pubDate>Fri, 28 Aug 2026 00:00:00 GMT</pubDate>
      <description>Data centers grow in TWh; grids grow in years. A generation queue is not a load queue, and MW in queue is not an operation date.</description>
    </item>
    <item>
      <title>Electric grid in Brazil — structure and bottlenecks</title>
      <link>https://blog.nilu.pro/en/blog/electric-grid-brazil/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/electric-grid-brazil/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>The SIN links Brazil&apos;s four subsystems; the roles of MME, EPE, ANEEL, and ONS; and why Mato Grosso&apos;s bottleneck is local delivery, not lack of generation.</description>
    </item>
    <item>
      <title>Electric grid in Europe — structure and bottlenecks</title>
      <link>https://blog.nilu.pro/en/blog/electric-grid-europe/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/electric-grid-europe/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>ENTSO-E and ACER coordinate codes and adequacy in Europe — they don&apos;t operate the grid or publish a single queue; the connection bottleneck is national.</description>
    </item>
    <item>
      <title>Electric grid as a growth constraint</title>
      <link>https://blog.nilu.pro/en/blog/electric-grid-growth-constraint/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/electric-grid-growth-constraint/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>M1–M4 map of the grid lot, labeled IEA/World Bank KPIs, and the gen≠load, queue≠COD, Europe≠one-grid locks.</description>
    </item>
    <item>
      <title>Electric grid in the United States — structure and bottlenecks</title>
      <link>https://blog.nilu.pro/en/blog/electric-grid-united-states/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/electric-grid-united-states/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>There&apos;s no single national bottleneck in the US: the FERC/NERC/ISO map, the generation queue, and the large-load process are distinct — with the right label.</description>
    </item>
    <item>
      <title>Capacity, interconnection queues, and reinforcement</title>
      <link>https://blog.nilu.pro/en/blog/grid-capacity-queues-reinforcement/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/grid-capacity-queues-reinforcement/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>Generation queue is not load queue, MW in queue is not operation date, and reinforcement comes from a study — not a universal MW threshold.</description>
    </item>
    <item>
      <title>How an electric grid works</title>
      <link>https://blog.nilu.pro/en/blog/how-electric-grids-work/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/how-electric-grids-work/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>Electric grid layers, the difference between volt, watt, and watt-hour, and why &apos;capacity&apos; has several distinct meanings.</description>
    </item>
    <item>
      <title>Who pays and who decides in grid expansion</title>
      <link>https://blog.nilu.pro/en/blog/who-pays-who-decides-grid/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/who-pays-who-decides-grid/</guid>
      <pubDate>Sun, 09 Aug 2026 00:00:00 GMT</pubDate>
      <description>Cost allocation, institutional roles, and concession terms documented in law, order, and tender — in the US, Brazil, and the European Union.</description>
    </item>
    <item>
      <title>Web agent-ready — what changes when part of the audience isn&apos;t human</title>
      <link>https://blog.nilu.pro/en/blog/web-agent-ready-discover-cite-execute/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/web-agent-ready-discover-cite-execute/</guid>
      <pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate>
      <description>Three layers — discover, cite, execute — organize what changes when bots and agents read your site, with clear priorities and limits.</description>
    </item>
    <item>
      <title>Web agent-ready — discovery vs. citation: SEO, GEO, and evidence</title>
      <link>https://blog.nilu.pro/en/blog/web-agent-ready-discovery-vs-citation/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/web-agent-ready-discovery-vs-citation/</guid>
      <pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate>
      <description>SEO is still the foundation; GEO has lab-grade method, but citation isn&apos;t a click or proof of return — what to actually measure.</description>
    </item>
    <item>
      <title>Web agent-ready — machine representations: HTML, Markdown, and chrome</title>
      <link>https://blog.nilu.pro/en/blog/web-agent-ready-representations/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/web-agent-ready-representations/</guid>
      <pubDate>Fri, 07 Aug 2026 00:00:00 GMT</pubDate>
      <description>How HTML, negotiated Markdown, and page chrome affect agents and the cost of serving bots — what&apos;s standard and what&apos;s still a hypothesis.</description>
    </item>
    <item>
      <title>Data centers — energy and environmental impacts</title>
      <link>https://blog.nilu.pro/en/blog/data-centers-energy-environmental-impacts/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/data-centers-energy-environmental-impacts/</guid>
      <pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate>
      <description>How power, energy, water, emissions, and local impacts relate — and which limits prevent universal conclusions.</description>
    </item>
    <item>
      <title>Data centers — geography, geopolitics, and sovereignty</title>
      <link>https://blog.nilu.pro/en/blog/data-centers-geography-geopolitics-sovereignty/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/data-centers-geography-geopolitics-sovereignty/</guid>
      <pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate>
      <description>How power, cables, territory, jurisdiction, and technology shape the geography and sovereignty of data centers.</description>
    </item>
    <item>
      <title>Data centers — how they work and why they are expanding</title>
      <link>https://blog.nilu.pro/en/blog/data-centers-how-they-work-and-why-they-are-expanding/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/data-centers-how-they-work-and-why-they-are-expanding/</guid>
      <pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate>
      <description>A guide to servers, racks, workloads, power, cooling, and the physical supply chain that constrains data-center expansion.</description>
    </item>
    <item>
      <title>Data centers — overview of infrastructure, expansion, and limits</title>
      <link>https://blog.nilu.pro/en/blog/data-centers-infrastructure-expansion-limits/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/data-centers-infrastructure-expansion-limits/</guid>
      <pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate>
      <description>How data centers combine computing, power, cooling, territory, and capital—and why their limits emerge in different ways.</description>
    </item>
    <item>
      <title>Data centers — political economy, investment, and local impacts</title>
      <link>https://blog.nilu.pro/en/blog/data-centers-political-economy-investment-local-impacts/</link>
      <guid isPermaLink="true">https://blog.nilu.pro/en/blog/data-centers-political-economy-investment-local-impacts/</guid>
      <pubDate>Wed, 29 Jul 2026 00:00:00 GMT</pubDate>
      <description>How capital, employment, incentives, tariffs, and regulation distribute data-center benefits, costs, and risks.</description>
    </item>
  </channel>
</rss>
